"Excel works fine for us." For a small project with five to ten apartments, that is often true. It gets difficult as soon as a second project comes along: several suppliers, parallel processes, deadlines that overlap. We did the maths on what this costs in working hours and how much of it can be saved.

One project is still manageable

With five to ten apartments, a well-kept list is enough. The number of selections stays manageable, two or three suppliers are involved, and the buyer manager keeps the open items in their head.

The risks are already there, though. A promise made at the sampling appointment that only exists in an email thread. A spreadsheet edited by two people at the same time. A deadline that nobody has in their calendar. As long as the project is small, such gaps hardly matter.

From the second project onwards

With the second project, the volume doubles, and the dependencies grow faster than the volume. Two sampling phases run at the same time, each with its own suppliers, its own deadlines and its own buyers. In practice, this means:

  • Several spreadsheets, often one per project and trade. Only the person who last edited a file knows which version is valid.

  • Suppliers need briefings from both projects. Every manual transfer is a source of errors.

  • Deadlines overlap. Whoever misses one usually notices only once the material has been ordered.

  • Buyer enquiries from both projects come in through the same channels: email, phone, appointments.

Buyer managers then spend a growing share of their time gathering information that already exists.

What this means in hours

For a project with 20 apartments, we estimate around 1,000 hours of buyer management. That is 50 hours per apartment.

This time is spent on tasks that do not appear in any cost breakdown:

  • Answering buyer enquiries and giving status updates

  • Recording selections, keeping them up to date and having them confirmed

  • Obtaining quotes from suppliers and passing them on

  • Monitoring deadlines and following up

  • Compiling the handover documentation

With two parallel projects of this size, it adds up to 2,000 hours.

What changes with a platform

Our estimate is deliberately cautious: with oneLynk, around 40 percent of this effort can be saved. For 20 apartments, that is 400 hours per project.

The savings come from the handovers between the parties involved. Buyers see their own status, selections and approvals are documented in one place, and nobody has to reconcile spreadsheets any more.

Suppliers still have to prepare quotes, and buyers still need advice. What gets shorter is the time in between.

Do the maths yourself

The calculation can be applied to any project:

Apartments × 50 hours × 40 percent × internal hourly rate

An example: 20 apartments at an internal hourly rate of CHF 100 result in 400 hours saved, or CHF 40,000 per project. With two parallel projects, the amount doubles.

For your own project size, use the ROI calculator on our website.

What the calculation does not cover

The hours only count the direct effort. On top of that come costs that are harder to quantify:

  • Disputes at handover because a promise cannot be proven

  • Delivery delays caused by incomplete briefings

  • Strain and staff turnover in teams that work at their limit for long periods

  • Buyers who feel poorly informed and tell others about it

Conclusion

Anyone managing more than one project is already paying the cost of a platform today, in the form of overtime and work that nobody sees. The only open question is whether these hours should go into looking after buyers or into updating spreadsheets.